Strictly Private & Confidential • Detailed Investment Prospectus

Investment Memorandum

Akwande Waterfront Resort & Lifestyle Precinct (Loskop Dam)

Prepared By: Dikgang Property Investments (Pty) Ltd

Location: GPS: 25°25'12" S | 29°21'44" E • ELEV: 1,000m AMSL

Date: Q3 2026

A

1 Executive Summary

Company & Sector

Dikgang Property Investments (Pty) Ltd
Mixed-Use Real Estate, Hospitality, Retail & Healthcare

Facility Size & Type

R1.8 Billion Senior Secured Term Loan
Paired with 4-Tier Fractional Equity Syndication

Purpose of Funding

Greenfield Development Capex
Funding Phase 1 (Hospitality/Marina) & Phase 2 (Retail/Medical)

Headline Terms

10-Year Tenor | 3-Year Moratorium | JIBAR + 3.5%
Secured via Mortgage Bonds & Lease Cessions

Key Credit Highlights: Akwande addresses the acute regional demand for premier 5-star eco-luxury waterfront destinations and high-traffic commercial infrastructure in Mpumalanga. Unlike traditional leisure resorts heavily exposed to seasonal hospitality cycles, Akwande is a self-sustaining ecosystem. It secures cash flows through blue-chip retail covenants (Pick n Pay, Woolworths, Sasol, McDonald's, KFC), a dedicated outpatient Medical Rehabilitation Centre, and a fractional ownership model. This structural diversification yields an exceptional stabilised DSCR of 2.15x and an unlevered IRR of 23.2%.

2 Business Overview & Architecture

The Vision: Conceived as an antidote to urban saturation, Akwande is sculpted into the dramatic granite topography of Loskop Dam. It is a 54-hectare utopia of recreation, mental emancipation, healthcare, and world-class leisure, positioned strategically on the N11 transit corridor.

The Master Precinct Ecosystem

Akwande represents a defining milestone in South African master planning, integrating massive infrastructure across distinct but synergistic economic pillars:

Geographic Footprint: Situated exactly at GPS 25°25'12" S | 29°21'44" E (Elevation 1,000m AMSL). The N11 location effectively captures both the Mpumalanga/Limpopo commercial transit market and the immense 16-million-person Gauteng leisure catchment.

3 Liberation Heritage & Cultural Masterpiece

Beyond physical infrastructure, Akwande is a vessel for profound African history. The estate organically fuses Mpumalanga’s liberation heritage with modern tourism, ensuring deep political and cultural support from provincial structures while establishing a unique global tourism identity:

4 Management & Governance

Key Executive / Committee Role & Track Record
Simon Setsoalo Chairperson & Lead Sponsor (Loskop Development): Extensive experience in large-scale PPP infrastructure, commercial real estate assembly, and stakeholder alignment.
International Hotel Operator Hospitality Management: The 120-key hotel and conference centre will be managed under a 15-year management contract by a Tier-1 international operator, assuring institutional standards.
Medical Operations Syndicate Healthcare Governance: The rehabilitation clinic and emergency triage center will be operated by a consortium of licensed medical practitioners and hospital administrators under a long-term lease.
Board & Audit Committees Independent investment committee setup, rigorous environmental compliance (EIA/NWA) auditing, and strict procurement oversight to satisfy major DFI and banking covenants.

5 Market & Industry Context

The South African tourism sector exhibits a severe undersupply of high-end, non-coastal, family-integrated resorts. Furthermore, healthcare and premium retail infrastructure in the Nkangala district is vastly underserviced relative to the economic output of local agriculture and mining.

Competitive Positioning & The "Blue Ocean": By combining a destination resort with a commercial fuel node (Sasol) and blue-chip retail (Pick n Pay, Woolworths), Akwande eliminates the risk of "seasonal weekend vacancy" that cripples traditional lodges. The retail, fast-food, and healthcare nodes generate high, steady weekday footfall from the N11 transit route and local towns.

16M+
Captive Market
650k
Target Footfall
0
Direct Competitors
365-Day
Economic Cycle

6 Use of Funds & Master Phasing

The total R3.0B capitalization is meticulously phased to ensure the primary revenue anchors (commercial retail, fuel, and core hospitality) generate self-sustaining free cash flow before the expansion into massive leisure infrastructure (waterpark/amphitheatre).

Phase & Timeline Capital Allocation (ZAR) Infrastructure Deployed
Phase 1 (Months 1-18) R 1.1 Billion Master Gatehouse (monumental quartzite & timber), bulk earthworks, solar/water utilities, 120-Key Hotel, 150-berth Marina, and Solomon Mahlangu Freedom Pavilion.
Phase 2 (Months 18-30) R 1.1 Billion 2-Hectare Shopping Village (Pick n Pay), Corporate Suites, Medical Rehabilitation Centre, Fitness Center, Sasol Fuel Station & Fast Food Court (Drive-thrus), 80 Chalets.
Phase 3 (Months 30-42) R 0.8 Billion 15-Slide Mega Waterpark, 1,500-seat Amphitheatre, fractional residential villas, and final heritage trail linkages.

7 Financial Projections (5-Year Horizon)

As a greenfield development, historical financials are replaced by an audited 5-year projection model. Key assumptions: 65% Stabilised Hotel Occupancy, 100% take-up of Medical & Retail Leases by Year 3, 7% annual inflationary escalations.

Consolidated Model (R 'Millions) Year 1 Year 2 Year 3 Year 4 Year 5
Gross Revenue (Hospitality & Leisure) 210.0 340.5 480.0 650.0 715.0
Gross Revenue (Commercial Leases & Fuel) 140.5 309.7 370.8 560.0 610.5
Total Gross Revenue 350.5 650.2 850.8 1,210.0 1,325.5
Total OPEX (inc. maintenance & staffing) (230.1) (370.0) (430.4) (630.0) (705.1)
EBITDA 120.4 280.2 420.4 580.0 620.4
EBITDA Margin (%) 34.3% 43.0% 49.4% 47.9% 46.8%

8 Cash Flow & Debt Service Capacity (CRITICAL)

The proposed R1.8B senior debt facility is modeled with a 3-year capital grace period (interest capitalized) to allow for Phase 1 & 2 stabilization. Principal amortisation begins in Year 4.

Target Average DSCR

2.15x

Min DSCR (Stress Test)

1.42x

Free Cash Flow (Y4)

R 210M+

Stress Test Scenario: Applying a severe downside shock—a 25% drop in hospitality occupancy and a 15% retail/medical vacancy rate—the project maintains a DSCR of >1.42x. This resilience is attributed to the fixed-lease nature of the Pick n Pay, Sasol, and medical clinic anchor tenancies, shielding debt service from tourism volatility.

9 Capital Structure & 4-Tier Fractional Equity

Total capital required is R3.0B, structured to balance senior leverage with a highly liquid 4-Tier Fractional Equity Syndication model aimed at private investors, medical syndicates, and institutional funds.

Sponsor & Fractional Equity (30%)R 900 M
↳ Tier 1: Medical & Commercial SyndicatesR 400 M
↳ Tier 2: Residential Fractional OwnershipR 300 M
↳ Tier 3: Core Sponsor CapitalR 200 M
Senior Secured Debt Facility (60%)R 1,800 M
Mezzanine Debt / DFI Funding (10%)R 300 M
Total Capital StackR 3,000 M

Note: Post-stabilization Leverage Metric (Net Debt / EBITDA) rapidly deleverages to <2.8x by Year 5.

10 Security & Covenant Package

The Senior Facility will be ring-fenced and secured by an airtight, institutional-grade collateral package: